Swaggs21 House Build Thread
It is an extra room upstairs that is 37' 4" x 18' 8" and will house my office and Stacy's library. It is labeled as a game room on the plans, but has a full bath up there as well, so it could be used as a guest room for emergency purposes.
:edit:
I just put the "Bonus Room" plan image up under the plans tab, you can see it there.
:edit:
I just put the "Bonus Room" plan image up under the plans tab, you can see it there.
Last edited by swaggs21; Sep 1, 2009 at 09:15 AM.
Negative on the roof sheeting, but still coming along. Getting ready to order cabling, electrical and plumbing supplies. Once the house is secured all of those things will start to be installed.
Here is the status as of Wednesday






Here is my new toy, Brand new, had 5 hours on it when we picked it up.



This is as of Saturday

Digging the walkout from the basment









This is as of this evening. As you can see, there is no dirt pile remaining.

Cutting the driveway in




Looking out the walk-out door



Still a lot more dirt needed to level out the lot, but it is coming along. Hoping to get the roof, windows, porch slab, and garage slab done this week. Hopefully will get all of the utlities done as well. We are doing all work except installing windows, that is still a part of the framer's fee.






Here is my new toy, Brand new, had 5 hours on it when we picked it up.



This is as of Saturday

Digging the walkout from the basment









This is as of this evening. As you can see, there is no dirt pile remaining.

Cutting the driveway in




Looking out the walk-out door



Still a lot more dirt needed to level out the lot, but it is coming along. Hoping to get the roof, windows, porch slab, and garage slab done this week. Hopefully will get all of the utlities done as well. We are doing all work except installing windows, that is still a part of the framer's fee.
Thanks for the comments guys, I am hoping to really start moving here soon, as soon as the framing contractor finishes up, which will hopefully be by the end of this week. I will still be putting on the roof though once he finishes up the things he needs to on that, which I cannot wait for it to happen so my house stops getting wet.