Notices
The Basement Non-Honda/Acura discussion. Content should be tasteful and "primetime" safe.

Swaggs21 House Build Thread

Thread Tools
 
Old Aug 12, 2009 | 06:51 AM
  #141  
Draconius's Avatar
Draconius
BAZINGA!
 
Joined: Aug 2004
Posts: 21,613
Likes: 0
From: San Diego, CA
Default

Originally Posted by swaggs21
Yep, hot water flows through the tubing to keep things toasty.
Do you have a cutoff/switch valve so you can divert the hot water in the summer?
Reply
Old Aug 12, 2009 | 08:16 AM
  #142  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by Draconius
Do you have a cutoff/switch valve so you can divert the hot water in the summer?
\

Yeah, there is a manifold that all of the water runs through and individual shutoffs for each line as well as one for the main line.

Pretty much all you do it turn the main line off and turn the circulating pump off in the summer and you are golden.

Originally Posted by reno96teg


perhaps one day i may take you up on it. it depends on how long we're in this house.

fantastic progress, btw.
Thanks, and I have familia in the poconos, so it is not that far of a jaunt. I am in Boston for work every once in a while as well.
Reply
Old Aug 12, 2009 | 03:13 PM
  #143  
sqkev's Avatar
sqkev
Junior Member
 
Joined: Jun 2006
Posts: 2,181
Likes: 0
Default

wow....i'm green w/ envy here

do you have plans to wire for network all around the house yet?
have plans to wire for the HT will save you $$ and time down the road as well
Reply
Old Aug 12, 2009 | 04:57 PM
  #144  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by sqkev
wow....i'm green w/ envy here

do you have plans to wire for network all around the house yet?
have plans to wire for the HT will save you $$ and time down the road as well
Network is all wireless, we are high tech here in WV. We don't need no stinkin' wires.

The rest of it will all be wired. I will probably use 10 AWG (possibly 8 AWG) for the speakers, and the projector will be hung at the same time everything is finished, but it will wired so that I could swap in a new projector and not have to run new wire.
Reply
Old Aug 12, 2009 | 05:52 PM
  #145  
sqkev's Avatar
sqkev
Junior Member
 
Joined: Jun 2006
Posts: 2,181
Likes: 0
Default

Originally Posted by swaggs21
Network is all wireless, we are high tech here in WV. We don't need no stinkin' wires.

The rest of it will all be wired. I will probably use 10 AWG (possibly 8 AWG) for the speakers, and the projector will be hung at the same time everything is finished, but it will wired so that I could swap in a new projector and not have to run new wire.

cant really stream all that 1080p material smoothly now...cant we?

hehe...just a suggestion..
i'm a huge media/audio type of guy so it's always one of the things on top of my list


w/ all the planning and physical labor and such on the house
do you have time for the wedding planning at all?
the lady is taking care of all that?
Reply
Old Aug 12, 2009 | 06:10 PM
  #146  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by sqkev
cant really stream all that 1080p material smoothly now...cant we?

hehe...just a suggestion..
i'm a huge media/audio type of guy so it's always one of the things on top of my list


w/ all the planning and physical labor and such on the house
do you have time for the wedding planning at all?
the lady is taking care of all that?
You would be suprised what you can stream on a N based network

I am a huge media person as well, make my own speakers and everything. I have a plan for everything, but I am more of a put it together when it comes type of person.

I am helping with the wedding planning, but I definitely do less than she does. I have 4 tasks left for the wedding, and I am getting them knocked out tomorrow.
Reply
Old Aug 12, 2009 | 06:47 PM
  #147  
sqkev's Avatar
sqkev
Junior Member
 
Joined: Jun 2006
Posts: 2,181
Likes: 0
Default

Originally Posted by swaggs21
You would be suprised what you can stream on a N based network

I am a huge media person as well, make my own speakers and everything. I have a plan for everything, but I am more of a put it together when it comes type of person.

I am helping with the wedding planning, but I definitely do less than she does. I have 4 tasks left for the wedding, and I am getting them knocked out tomorrow.
i'm on wireless N and i dont think it's up to the task (or maybe i'm not much of an IT type of a guy )


hope everything come together for the big day

oh...and congrats on everything
Reply
Old Aug 12, 2009 | 08:36 PM
  #148  
Chefboiali's Avatar
Chefboiali
scrotal surge
 
Joined: Oct 2005
Posts: 15,460
Likes: 0
From: Cali
Default

Amazing what you're doing. If I wasn't so addicted to this ocean breeze, I'd wise up and build my home like you're doing.

Originally Posted by Skelly_GSR
Fucking word.

Ive been working on my 12'x12' room for 4 weeks :uhhok:
Don't go messing up mommy and daddy's house now.

o:
Reply
Old Aug 13, 2009 | 06:32 AM
  #149  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by Chefboiali
Amazing what you're doing. If I wasn't so addicted to this ocean breeze, I'd wise up and build my home like you're doing.
Thanks Chef, always glad to hear positive encouragement.

It is a great experience. I am loving every minute of it, even the times when contractors call and they are supposed to be there the next day and then tell me they will be there in a month. Fine, i will get another contractor since you don't want to do the work without an appropriate time frame of notice.

I am really excited to get started on my part of things though. Most of the stuff has been contractor done till now (except for the basement stuff) and I am itching to get my hands dirty running plumbing, electrical etc. That will start Tuesday once the slab is poured and finished on Monday. I would like to be working of an evening on a daily basis, keeps things fresh in my head along with progress on all fronts.

Last edited by swaggs21; Aug 13, 2009 at 06:57 AM.
Reply
Old Aug 18, 2009 | 09:31 AM
  #150  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Concrete floor is down, new pictures up.

Waiting on the excavation contractor to call back so he can come back fill the walls, then we can get started back with some good progress again.
Reply



All times are GMT -8. The time now is 10:18 PM.