So the electrical is done except for the garage, which is going to wait a little while, probably right before the inspection. Plumbing is going to start this weekend, all of the fixtures should be in by next weekend as long as they are here next week on time.
Looks awesome man - nothing quite like the feeling of playing in a live electrical box. After you take a few 110 shocks, you realize it isn't the worst thing ever. But the house looks unreal - congrats. Keep the pics coming.
When you are playing in the box, it is 230, and it will kill instantly most of the time.
110 Tickles, 230 you better hope for a miracle.
Thanks for the comments guys.
This weekend will be kind of a slow weekend building wise for me. I am waiting on a lot of the plumbing fixtures to come in, and the weather is miserable. I think most of the weekend is going to be spent cleaning up and setting up my workshop in the basement, maybe get my cabinet saw assembled and hooked up finally. If the weather isn't to bad I am going to go pick up some 3/4 OSB and some framing lumber and go ahead and get the utility room and bathroom framed out in the basement as well.
This weekend will be kind of a slow weekend building wise for me. I am waiting on a lot of the plumbing fixtures to come in, and the weather is miserable. I think most of the weekend is going to be spent cleaning up and setting up my workshop in the basement, maybe get my cabinet saw assembled and hooked up finally. If the weather isn't to bad I am going to go pick up some 3/4 OSB and some framing lumber and go ahead and get the utility room and bathroom framed out in the basement as well.