Swaggs21 House Build Thread
I can't while I am taking the picture 
I have done a lot of work on the house, I promise you. I have even helped a bunch with the framing even though I am paying to have it done. I like helping when I need a break from work. Help for 10 minutes, then walk back down to the apartment and work some more.
You should come down after the wedding if you want to learn how to do some things, by then I should be putting on shingles and siding along with all the electrical and plumbing. Once that is complete then it is drywall and start finishing things.

I have done a lot of work on the house, I promise you. I have even helped a bunch with the framing even though I am paying to have it done. I like helping when I need a break from work. Help for 10 minutes, then walk back down to the apartment and work some more.
You should come down after the wedding if you want to learn how to do some things, by then I should be putting on shingles and siding along with all the electrical and plumbing. Once that is complete then it is drywall and start finishing things.
Last edited by swaggs21; Aug 11, 2009 at 05:51 PM.
I can't while I am taking the picture 
I have done a lot of work on the house, I promise you. I have even helped a bunch with the framing even though I am paying to have it done. I like helping when I need a break from work. Help for 10 minutes, then walk back down to the apartment and work some more.
You should come down after the wedding if you want to learn how to do some things, by then I should be putting on shingles and siding along with all the electrical and plumbing. Once that is complete then it is drywall and start finishing things.

I have done a lot of work on the house, I promise you. I have even helped a bunch with the framing even though I am paying to have it done. I like helping when I need a break from work. Help for 10 minutes, then walk back down to the apartment and work some more.
You should come down after the wedding if you want to learn how to do some things, by then I should be putting on shingles and siding along with all the electrical and plumbing. Once that is complete then it is drywall and start finishing things.
I would love to come down and check it out. I'm currently working on my room. I put drywall in there and am currently mudding it. Its taking me a lot longer than normal, but so far so good. I'll help you too
h:
I am contracting out the finishing of the drywall. I will hang it all day long, but I suck at finishing it. Plus it will take him 2 days to do the whole house, and it would take me months.
I would come up and help you do it, that is for sure.
Yep, hot water flows through the tubing to keep things toasty.


