Originally Posted by jaymar88
This thing is going to go by so quickly. I can see it already.
To me it has seemed like forever, and this is my 3rd house. I guess looking at it now, it hasn't been to bad, I just really needed to synch it up to the wedding, but now I don't even have to worry about that.

Originally Posted by JessTD
oh i agree, with a pro crew doing the framing it should be no time. pics of the whole process though are a must !
The current schedule is to have the house under tar paper by the 31st if the digging starts Thursday.

And there will definitely be pics of the whole process. Now that I will be dwelling that close, I can take pics every couple of hours when I need a break.
Reply
Old Jul 13, 2009 | 09:45 AM
  #52  
jaymar88's Avatar
jaymar88
HA.net Workout Krew
 
Joined: Mar 2002
Posts: 9,039
Likes: 0
From: In the gym
Default

Yeah.. there's a guy on the bimmer board that documented his huge renovation. Basically more tha doubling his existing living space. He hired an omish team of woodworkers to frame up the construction. They were done in like a week/tyvek wrapped and ready to install roof tiles/siding
Reply
Old Jul 13, 2009 | 10:06 AM
  #53  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by jaymar88
Yeah.. there's a guy on the bimmer board that documented his huge renovation. Basically more tha doubling his existing living space. He hired an omish team of woodworkers to frame up the construction. They were done in like a week/tyvek wrapped and ready to install roof tiles/siding
I would have to look at the schedule again, but I am fairly sure subfloor to under tar paper is 11 days on mine. Basement is 3 days, and then a couple of days to hang windows and doors.
Reply
Old Jul 13, 2009 | 10:09 AM
  #54  
jaymar88's Avatar
jaymar88
HA.net Workout Krew
 
Joined: Mar 2002
Posts: 9,039
Likes: 0
From: In the gym
Default

Originally Posted by swaggs21
I would have to look at the schedule again, but I am fairly sure subfloor to under tar paper is 11 days on mine. Basement is 3 days, and then a couple of days to hang windows and doors.
yeah, thats damn quick. I wish I had the freedom to plan out even the lighting design. I think that's another project coming down my way and it's going to be a messy one.
Reply
Old Jul 13, 2009 | 10:10 AM
  #55  
shirley's Avatar
shirley
CBOTY 2010
 
Joined: Nov 2004
Posts: 34,786
Likes: 0
From: MI
Default

these days basements are so quick, they have all the preformed foam, put it up, place the re-rod, pour the concrete and done leave the foam for insulation. it's insane
Reply
Old Jul 13, 2009 | 10:58 AM
  #56  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Originally Posted by JessTD
these days basements are so quick, they have all the preformed foam, put it up, place the re-rod, pour the concrete and done leave the foam for insulation. it's insane
Mine will be Superior Wall.

Best foundation out there. Costs a little more, but the benefits are off the charts.

http://www.superiorwalls.com/
Reply
Old Jul 13, 2009 | 11:02 AM
  #57  
jaymar88's Avatar
jaymar88
HA.net Workout Krew
 
Joined: Mar 2002
Posts: 9,039
Likes: 0
From: In the gym
Default

I don't know nothing bout basements other than I post in it all day long.
Reply
Old Jul 13, 2009 | 11:05 AM
  #58  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

LoL.

Superior Wall is preformed at a factory, has the metal studs already attached for running wiring and drywall, made with 5000 psi concrete (most stuff is 2000 psi), sets on a crushed stone foundation, guaranteed for life for water from the sides, and all my basement, garage, and porch walls will be set in 9 hours.
Reply
Old Jul 13, 2009 | 11:07 AM
  #59  
shirley's Avatar
shirley
CBOTY 2010
 
Joined: Nov 2004
Posts: 34,786
Likes: 0
From: MI
Default

Originally Posted by swaggs21
Mine will be Superior Wall.

Best foundation out there. Costs a little more, but the benefits are off the charts.

http://www.superiorwalls.com/
o snap

that pretty awesome
Reply
Old Jul 16, 2009 | 04:00 AM
  #60  
swaggs21's Avatar
swaggs21
Thread Starter
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Closed last night, everything is a go now.

The excavator had to take another job before mine since it has taken so long for the bank to give the ok, so he will be on-site Tuesday morning, basement walls should be up by next Saturday evening at the latest.

Ordering the walls, subfloor, and trusses this morning, along with opening up accounts with the concrete and lumber distributor I am planning to use for the project.