Originally Posted by
b00gers
Need more pics you guys

Ive been taking some. No pics until finish though. Heres what was/will need done.
-Rip down old frame hiding the hvac
-Enclose sliding closet door and put up a stud in its place and drywall over it.
-Run some newer wiring
-Drywall over existing wood paneling walls
-mud all walls
-prime walls and ceiling
-paint walls and ceiling
-Add crown and baseboard molding
-Install laminate flooring
-Add a new main light and put maybe track lights under the new hvac fame i built.
I maybe overbuild the HVAC frame. I was testing out my shoulder and was hanging on it and it held no problem

h:
My room is pretty small but damn its alot of time

h: