Originally Posted by
mayonaise
if they're looking to fix the supply problem, they need a solution within six months or so. while the car is still fresh and hot, and demand is soaring, they need to move immediately and take advantage of it. 18-24 months is way too long to wait, because the demand will have subsided by then.
However, the Fit is now overdue for a
full model change (FMC). That's why when the Greensburg, IN assembly line comes online in 18-24 months it's almost certain the first model produced there will be the second-generation model.