HAN & Hurricane Rita
With Rita closing in on Texas I'm sure massive amounts of the state will experience outages.
HAN is hosted on servers in Dallas, Texas. While this is further inland and may not physically be effected by the hurricane much, it could disrupt power to Dallas.
In the case that it does and you cannot access HAN, this is most likely the reason.
This all depends on how the outages effect Dallas, and I'm not sure how that will be.
Thanks
HAN is hosted on servers in Dallas, Texas. While this is further inland and may not physically be effected by the hurricane much, it could disrupt power to Dallas.
In the case that it does and you cannot access HAN, this is most likely the reason.
This all depends on how the outages effect Dallas, and I'm not sure how that will be.
Thanks
__________________
99 Integra GSR
06 TSX
duck squad member #00003
99 Integra GSR
06 TSX
duck squad member #00003
Originally Posted by Grifter
announcement?
Here is a little information about our Server Location:
The datacenter facility sits atop multiple power grids driven by TXU electric, with PowerWare UPS battery backup power and dual diesel generators onsite. Our HVAC systems are condenser units by Data Aire to provide redundancy in cooling coupled with ten managed backbone providers. Twelve more third party backbone providers are available in the building via cross connect. Fire suppression includes a pre-action dry pipe system including VESDA (Very Early Smoke Detection Apparatus) with over 700 smoke detectors between the two facilities.
__________________
99 Integra GSR
06 TSX
duck squad member #00003
99 Integra GSR
06 TSX
duck squad member #00003
Originally Posted by LT6916
jeez, the white house probably doesn't have all that.
* 60,000 sq. ft. facility
* 35,000 sq. ft. of raised floor
* (21) 26-ton Data Air AC units
* Very Early Smoke Detection Apparatus (VESDA)
* Pre-action dry pipe sprinkler system
* Over 500 smoke detectors in an integrated system
* Northern Proximity security badge entry/exit on all doors to facility
* Multiple TXU electrical grids
* 4800 amps of 480v input power
* 3 main transfer switches
* (6) 500KVA Powerware UPS units with 90 batteries per unit
* Standalone PDUs at each cabinet row
* 1-megawatt generator (2000-gallon tank)
* 1.5-megawatt generator (2200-gallon tank)
* DataTrax monitoring software for all data center infrastructure
__________________
99 Integra GSR
06 TSX
duck squad member #00003
99 Integra GSR
06 TSX
duck squad member #00003
Here's an example of a worst case senario... going worse.
One of my sites is housed in a data center that has 5 generators. It only takes 4 to completly power the whole place for a week.
Unfortunatly 2 generators failed durring a recent power outage lasting longer than the batteries could sustain. Completely shutting the place down. So yea, HAN could be down for a while.
Time to get a few backup servers... I put one in Chicago, New York and say UK.
One of my sites is housed in a data center that has 5 generators. It only takes 4 to completly power the whole place for a week.
Unfortunatly 2 generators failed durring a recent power outage lasting longer than the batteries could sustain. Completely shutting the place down. So yea, HAN could be down for a while.
Time to get a few backup servers... I put one in Chicago, New York and say UK.