Originally Posted by
e3NiNe
I've done my entire area by hand. That shit was brutal. Every cube was removed by a pick-axe. It all started off as a 2x2 trench next to the brick house ... and now it's a pretty large area.

h:
The ultra lower level on the otherhand ...
1. 1 shot TNT
2. repair floor
3. even ceiling
4. repeat
wait until you see the basement i am doing in my building. its being all done by hand. spent 3 fricking hours on it last night...... got it 75% done. it goes 20/21 blocks down and is the same width as the building. i figured once i get this clear i can go lower.