View Single Post
Old Nov 9, 2010 | 08:29 AM
  #1182  
ShaolinLueb's Avatar
ShaolinLueb
Senior Member
 
Joined: Jun 2002
Posts: 14,544
Likes: 0
From: Holyoke, MA
Default

Originally Posted by e3NiNe
I've done my entire area by hand. That shit was brutal. Every cube was removed by a pick-axe. It all started off as a 2x2 trench next to the brick house ... and now it's a pretty large area. h:

The ultra lower level on the otherhand ...
1. 1 shot TNT
2. repair floor
3. even ceiling
4. repeat
wait until you see the basement i am doing in my building. its being all done by hand. spent 3 fricking hours on it last night...... got it 75% done. it goes 20/21 blocks down and is the same width as the building. i figured once i get this clear i can go lower.