View Single Post
Old 08-26-2010, 03:48 PM
  #8  
Spec R
Moderator
 
Spec R's Avatar
 
Join Date: May 2002
Location: Beverly Hills, CA
Posts: 14,429
Likes: 0
Received 0 Likes on 0 Posts
Default

i dont kno when i'll be done. its really hard to do work on the car since its been so hot, but i expect to get a lot done this weekend.

my first goal is to get the new harness in and get the car running again. then after everything checks out, start doing the stereo, alarm, a/c, etc. those involve their own stuff too. i have to buy new RCA cables, A/C drier, shift boot, arm rest, and some other stuff.
__________________
DB Squad
Integra Forum Moderator
2016 BMW 340i M-Sport / 2013 Chevrolet Volt / 1999 Subaru Impreza RS EJ205