View Single Post
Old Mar 8, 2010 | 05:57 PM
  #257  
swaggs21's Avatar
swaggs21
 
Joined: Dec 2002
Posts: 5,747
Likes: 0
From: Lumberport, WV
Default

Drywall is very hard to get right. Hanging is a piece of cake. Finishing is another story.

And Dubby, you are right, I had to address that stud tonight when I was drywalling the master bedroom. There are some things that the framer did that I am not real happy with, but those types of things do happen if meticulous attention is not paid.

Put 12 more sheets up tonight, hoping I can keep that pace up. If so, I should be ready for finish around the end of March.

Last edited by swaggs21; Mar 8, 2010 at 05:59 PM.
Reply