tie a rope at the top of driver side vertical pilar, wrap it aroudn the tree and tie the other end to the top of pass. side pilar. and pull ur car back.
Time: 20 minutes
whatever u'r trying to do 1-3 days.
but i guess u wanna do it the right way,
U can see where all the spot welds are and drill through them. I think there's also some glue involved, if there is, then u can burn it off.