Thread: Monday FTL
View Single Post
Old Nov 19, 2007 | 06:27 AM
  #26  
THEOLDMAN's Avatar
THEOLDMAN
Checking it twice
 
Joined: May 2002
Posts: 13,539
Likes: 0
From: Twixt Hell/Ann Arbor MI
Default

Originally Posted by k3ifers
damn, haven't you been doing that for a while?
Since the summer...I don't have unlimited credit and I have to pay as I go. So if I ran out of material I had to wait for my next check...once a month, and I still had to pay other bills. It's been usable and it's only minor stuff that needs to be done now. Touch up drywall, set nails, paint, make some cabinet doors. I had to redo the plumbing to move a toilet and build a pipe chase for the plumbing for upstairs and ductwork for the upstairs bath, then build cabinets in front of all that to hide it and make it look like it always was there. If I would have done this bath for a client labor and materials/fixtures/cabinets/lighting would have come in around 18,000.
__________________
Life is not a journey to the grave with the intention of arriving safely in a pretty and well preserved body, but rather to skid in broadside, thoroughly used up, totally worn out, and loudly proclaiming ...."WOW! What a ride!!!!!"

LUNCH with THEOLDMAN...On a break for now...
Reply