My new Air Ride
#1
streetracingdayton.com
Thread Starter
Join Date: Jan 2003
Location: Dayton Ohio
Posts: 86
Likes: 0
Received 0 Likes
on
0 Posts
My new Air Ride
My kit finally came in today and I took pics thought I would share its for my 92 accord
-Matt
My new Air Ride
one more pic of the full kit
Switch Box
3" Rear Cylinders W/ Brackets
5 Gallon Tank
Viair 450c 100% Duty Compressor
4" Front Cylinders w/ offset Brackets
1 Of my Viair Dual Needle Gauges
Our Custom 300 Psi Valve Block to make the install simple
-Matt
My new Air Ride
one more pic of the full kit
Switch Box
3" Rear Cylinders W/ Brackets
5 Gallon Tank
Viair 450c 100% Duty Compressor
4" Front Cylinders w/ offset Brackets
1 Of my Viair Dual Needle Gauges
Our Custom 300 Psi Valve Block to make the install simple
#3
streetracingdayton.com
Thread Starter
Join Date: Jan 2003
Location: Dayton Ohio
Posts: 86
Likes: 0
Received 0 Likes
on
0 Posts
it cost me 1750, the valve block makes the plumbing and install easy saves about 3 hours off the install time.
The valve block can handle up to 300 psi and when used in conjunction with 1/2" lines we have made accord wagons hop off the ground
The valve block can handle up to 300 psi and when used in conjunction with 1/2" lines we have made accord wagons hop off the ground
#4
cx power!
Join Date: Jun 2002
Location: berkeley, ca --> la, ca representin' tha 510&626
Posts: 2,435
Likes: 0
Received 0 Likes
on
0 Posts
Originally posted by Howitt
it cost me 1750, the valve block makes the plumbing and install easy saves about 3 hours off the install time.
The valve block can handle up to 300 psi and when used in conjunction with 1/2" lines we have made accord wagons hop off the ground
it cost me 1750, the valve block makes the plumbing and install easy saves about 3 hours off the install time.
The valve block can handle up to 300 psi and when used in conjunction with 1/2" lines we have made accord wagons hop off the ground